Skip Navigation
Small Business Innovation Research/Small Business Tech Transfer

A ZigBee-Based Wireless Sensor Network for Continuous Sound and Noise Level Monitoring on the ISS

Completed Technology Project
911 views

Project Description

A ZigBee-Based Wireless Sensor Network for Continuous Sound and Noise Level Monitoring on the ISS
The International Space Station (ISS) needs to keep quiet to maintain a healthy and habitable environment in which crewmembers can perform long-term and uninterrupted scientific research under microgravity conditions. Acoustic survey is now performed once every two months using hand-held devices at 60 locations on the ISS. It takes a significant amount of precious crew time and the sporadic monitoring program is not adequate. NASA has defined a need for an automated, continuous acoustic monitoring system that is efficient in power consumption (long battery life), accurate, highly integrated, wireless connected, scalable, small and lightweight. WeVoice Inc.\ proposed to develop a ZigBee-based wireless sensor network for acoustic monitoring to meet the challenges. During Phase I of this projects, three essential capabilities were developed, tested, and validated: * The design of a data collection subsystem that integrates measurement microphones and the feasibility of using the state-of-the-art MEMS microphones. * The development of accurate and computationally efficient signal processing algorithms for acoustic frequency (octave, 1/3-octave, and narrowband) analysis and sound level measurement. * The construction of a ZigBee network for data communication. In addition, the WeVoice SBIR research team has started working on flight-like devices. Clear directions for improvement were established for the Phase II efforts that may follow. The Phase II program focuses on system integration and optimization, software implementation, and graphical user interface development. An in-situ calibration plan will be suggested and a demonstrable system will be delivered to NASA for testing in a ground facility at the completion of the Phase II contract. So the expected TRL then is expected to reach 6. More »

Anticipated Benefits

Project Library

Primary U.S. Work Locations and Key Partners

Technology Transitions

Light bulb

Suggest an Edit

Recommend changes and additions to this project record.
^