Skip Navigation
Space Technology Research Grants

Europa Kinetic Ice Penetrator (EKIP)

Active Technology Project

Project Introduction

Europa Kinetic Ice Penetrator (EKIP)
The goal of the proposed work is to validate an initial design for a Europa penetrator that can withstand the high g load associated with the expected hypervelocity impact and enable post impact telemetry data. The proposed system would consist of a two-stage penetrator entry. The first stage would have the hard impact into the solid ice. Any deorbiting motors would be attached to the lead stage and add to the total mass involved in the initial impact. The second stage which carried the necessary electronics, would separate prior to impact from lead section. Because of the initial impact, this 2nd stage penetrator will experience less deformation and achieve greater penetration. As a result the mass of a two-stage system could be in fact less than a single stage system because less reinforcing will be required. To validate the system the proposed work will include (1) RAM accelerator studies to quantify ice penetration and changes in the property of the ice including subsurface fracturing as a function of shape of the projectile, temperature of the ice, and a 2nd impact; (2) calibrate a simulation model with these results to identify simulant material that will behave in a similar fashion as ice at the proposed speeds and then use these simulations to predict the behavior of the full size penetrator system against the simulant material; (3) field test a full size prototype based on the simulations in the high speed (< 1 km/s) regime but modified to take into account differences associated with the hypervelocity impact regime and (4) undertake a preliminary design for the survivability of key electronic components from the impact and their continued operation in the low temperatures of Europa. More »

Anticipated Benefits

Primary U.S. Work Locations and Key Partners

Project Library

Share this Project

Organizational Responsibility

Project Management

Project Duration

Technology Maturity (TRL)

Technology Areas

Target Destination

^