Skip Navigation
Small Business Innovation Research/Small Business Tech Transfer

ACES-Based Testbed and Bayesian Game-Theoretic Framework for Dynamic Airspace Configuration, Phase II

Completed Technology Project
453 views

Project Description

ACES-Based Testbed and Bayesian Game-Theoretic Framework for Dynamic Airspace Configuration, Phase II
This SBIR effort is focused on developing a Dynamic Airspace Configuration (DAC) concept where-in ARTCCs can benefit from re-configuring airspaces based on Traffic Flow Management (TFM) restrictions, and the development of a preliminary Airspace Concept Evaluation System (ACES)-framework and initial algorithms to demonstrate that ARTCCs need to engage in a coordination framework of exchanging TFM restriction until they determine mutually-agreeable optimal airspace configuration. The development of algorithms that leverage and recognize the interactions and interdependencies between DAC and TFM is the key innovation of this effort. Some examples of expected operational improvements include 1) reduction in congestion and delays when sector capacities (Monitoring Alert Parameter or Dynamic Density) are violated, 2) reduction in controller workload and improved safety, 3) ability to accommodate user preferred routes and weather uncertainty and 4) achieve a balance between airborne delay and grounding holding delay. The SBIR Phase-I effort demonstrated how a combined DAC-TFM algorithm determines an optimal airspace configuration different from a DAC-only algorithm and could result in minimization of peak count and dwell time variance. The effort also included the design and preliminary implementation of a TFM model that uses ARTCC sector configuration to determine the delays that is generated, absorbed and propagated. The Phase II effort includes development of DAC-TFM framework as an enhancement to NASA's ACES- DADS (Dynamic Airspace Design Service) work and interaction of NASA's airspace partitioning DAC algorithms such as MxDAC, DAU slicing and Sector Combination algorithms with the TFM models using the same framework. More »

Primary U.S. Work Locations and Key Partners

Technology Transitions

Light bulb

Suggest an Edit

Recommend changes and additions to this project record.

This is a historic project that was completed before the creation of TechPort on October 1, 2012. Available data has been included. This record may contain less data than currently active projects.

^