Lunar Excavator Validation, Phase I

Completed Technology Project

Project Introduction

Lunar Excavator Validation, Phase I
Energid Technologies proposes to create a tool for simulation-based verification of lunar excavator designs. Energid will combine the best of 1) automatic control system generation from computer aided design (CAD) models, 2) rapid validation of complex mechanism designs, and 3) detailed simulation models of the lunar environment, including regolith, dust, temperature, remote supervision, and communication latency to create a system of high value to NASA. Energid has previously developed unique algorithms for controlling and simulating complex robotic mechanisms automatically from just a CAD description. These algorithms will be leveraged to create a system to quickly test excavation systems by generating optimal control algorithms for use in studies. Energid has also developed high-fidelity real-time physics-based simulation algorithms that include models of internal forces and the forces produced when a mechanism interacts with the outside world. This existing capability will be combined with an innovative organization for simulation algorithms, new regolith simulation methods, and a unique control and study architecture to make a powerful tool with the potential to transform the way NASA verifies and compares excavator designs. More »

Primary U.S. Work Locations and Key Partners

Project Library

Share this Project

Organizational Responsibility

Project Management

Project Duration

This is a historic project that was completed before the creation of TechPort on October 1, 2012. Available data has been included. This record may contain less data than currently active projects.

A final report document may be available for this project. If you would like to request it, please contact us.

^