Skip Navigation
Small Business Innovation Research/Small Business Tech Transfer

Reconfigurable L-band Radar Transceiver using Digital Signal Synthesis, Phase II

Completed Technology Project

Project Introduction

Reconfigurable L-band Radar Transceiver using Digital Signal Synthesis, Phase II
This Phase II proposal, builds upon the extensive research and digital radar design that has been successfully completed during the Phase I contract. Key innovations of the proposed Phase II work will be • High update rate software configurable Direct Digital Synthesizer (DDS) design. The state-of-the-art DDS ICs can operate at 1 GHz update rates. IAI proposes to achieve the same or higher update rates, with increased flexibility (in frequency/ phase tuning) which arises from the software defined nature of the DDS implementation. • High-sampling rate (400 MHz and above), multi-channel digital receiver design. On-board signal processing capabilities will be integrated in the receiver. This includes digital implementation of commonly used radar receiver architectures (Digital down-up conversion, Digital filtering, Correlation, SAR imaging). • Digital implementation of direct RF generation techniques for L-Band frequencies. Flexible and scalable analog up-conversion techniques would be implemented to generate frequencies in the S-Band, X-Band, going up to the Ku band. • Scalable and modular hardware architecture to support multiple radar missions. Such a design approach would also address the issue of portability between different reconfigurable logic device families/ vendors. • Technology transition to adapt the radar design to meet space qualified standards. More »

Primary U.S. Work Locations and Key Partners

Technology Transitions

Project Library

Share this Project

Organizational Responsibility

Project Management

Project Duration

Technology Areas

Light bulb

Suggest an Edit

Recommend changes and additions to this project record.

This is a historic project that was completed before the creation of TechPort on October 1, 2012. Available data has been included. This record may contain less data than currently active projects.

^