Skip Navigation
SBIR/STTR

Virtual Satellite Integration Environment, Phase II

Completed Technology Project

Project Introduction

Virtual Satellite Integration Environment, Phase II
An integrated environment for rapid design studies of small satellite missions will be developed. This environment will be designed to streamline processes at the NASA Ames Mission Design Center. Several key concepts are introduced. The proposed environment introduces modern Product Data Management and Product Lifecycle Management (PDM/PLM) tools and processes to satellite mission design. Specifically, the notion of product structure, or bill of material (BOM), is expanded to a simulation BOM, or SBOM, with the capability to manage engineering analysis data, files and processes in the context of a product, in this case satellite mission. This approach constitutes a significant step beyond mere document management, which limits the traceability of which model of which analysis belongs to which version of the geometry or other analysis. It is a key enabler for model re-use. A Linked Model Environment (LME), i.e. an environment where all engineering analysis models are associatively linked, which was developed concurrently in the commercial aerospace and automotive industry, will extended to satellite mission design. This environment significantly reduces the amount of manual intervention engineers have to perform to translate information from one simulation tool to another. The concept of digital mockup (DMU), which typically addresses form and fit of components in an assembly, is expanded to include function, such that the inclusion of components in a satellite assembly that are functionally incompatible is rejected. Repetitive-iterative engineering tasks will be automated with the help of an integration framework tool which automates the execution of a sequence of codes and provides the capability to wrap drivers like optimizers or quality engineering tools around an automated analysis workflow. More »

Primary U.S. Work Locations and Key Partners

Project Library

Share this Project

Organizational Responsibility

Project Management

Project Duration

This is a historic project that was completed before the creation of TechPort on October 1, 2012. Available data has been included. This record may contain less data than currently active projects.

A final report document may be available for this project. If you would like to request it, please contact us.

^