Skip Navigation
Small Business Innovation Research/Small Business Tech Transfer

Structural-Acoustic Simulations in Early Airframe Design, Phase I

Completed Technology Project
408 views

Project Description

Structural-Acoustic Simulations in Early Airframe Design, Phase I
The structural design during the early development of an aircraft focuses on strength, fatigue, corrosion, maintenance, inspection, and manufacturing. Usually the acoustic requirements are met after the design of the fuselage structure has been completed. Ideally the structural-acoustic concerns should enter the design cycle early and they should be considered along with other main design disciplines within a Multi-disciplinary Design Optimization (MDO) environment. The proposing firm is uniquely positioned for developing technology which will bring structural-acoustic simulations early in the airframe design process because of their Energy Finite Element Analysis (EFEA) product for structural-acoustic simulations of large systems, and their development of a general purpose code for Multi-disciplinary Design Optimization under Uncertainty (MDO-U). The proposed Phase I project will demonstrate the feasibility of including structural-acoustic simulations in early airframe design. An adjoint sensitivity formulation will be implemented in the EFEA for enabling the utilization of the EFEA within a design optimization environment. In a case study a representative airframe structure will be optimized simultaneously for two different disciplines, using common design variables. An impact type of concern (representative of impact applications for rotorcraft and aircraft, and of shock applications for launch vehicle dynamics) and a structural-acoustic performance due to structure-borne and air-borne excitations (representative to aircraft, rotorcraft, and launch vehicle applications) will be considered. The MDO-U and the EFEA codes will be utilized in the case study, which will demonstrate the feasibility and the value of bringing structural-acoustics early in the design cycle. More »

Primary U.S. Work Locations and Key Partners

Light bulb

Suggest an Edit

Recommend changes and additions to this project record.

This is a historic project that was completed before the creation of TechPort on October 1, 2012. Available data has been included. This record may contain less data than currently active projects.

^