Highly Adaptive Primary Mirror Having Embedded Actuators, Sensors, and Neural Control, Phase II
Xinetics has demonstrated the technology required to fabricate a self-compensating highly adaptive silicon carbide primary mirror system having embedded actuators, sensors, and neural control with an areal density less that 10Kg/m2. The system architecture complete with feedback sensors, and neural algorithm was conceived, modeled and tested, and appears scaleable to 10-30meter class deployable systems. Highly adaptive telescopes require self-compensating telescope components to enable autonomously optimized optical trains to achieve very low total system wavefront error. High sensitivity semiconductor strain gages were shown to have adequate resolution for shape control. Resistance RTD sensors were shown to provide more than adequate temperature sensitivity. Analysis of strain gage placement conducted during this Phase I showed that the strain sensors required for neural control will require very high precision strain measurement (less than 1 microstrain), potential sensors were tested and characterized. Phase I data acquisition system limitations prevented full closed loop hardware demonstration. As a result Xinetics demonstrated the closed loop function using FEA analysis to provide simulated data to train the MATLAB based neural control algorithm. Phase I results show very encouraging performance and provide design information for a solid technical plan for full hardware demonstration in a phase II. More »

Primary U.S. Work Locations and Key Partners

Project Library

Share this Project

Organizational Responsibility

Project Management

Project Duration

This is a historic project that was completed before the creation of TechPort on October 1, 2012. Available data has been included. This record may contain less data than currently active projects.

A final report document may be available for this project. If you would like to request it, please contact us.

^