Skip Navigation
SBIR/STTR

Task-Specific Asteroid Simulants for Ground Testing, Phase I

Completed Technology Project

Project Introduction

We will design, prototype, and test a variety of asteroid simulants needed to validate most aspects of asteroid ISRU processes. These include physical simulants for excavation, transfer, and preparation (including comminution); chemical/mineralogical/volatile simulants for processing tests such as volatiles extraction, metals extraction, and oxygen production; and simulants to evaluate scientific and commercial instrumentation. The need for task-specific asteroid simulants is illustrated by the history of ill-designed and ill-applied lunar simulants, and current practices for asteroid simulants, which are marked by ad-hoc improvisation that frequently results in an inability to compare results among experiments or reliably repeat experiments for confirmation. More »

Anticipated Benefits

Primary U.S. Work Locations and Key Partners

Share this Project

Organizational Responsibility

Project Management

Project Duration

Technology Maturity (TRL)

Technology Areas

A final report document may be available for this project. If you would like to request it, please contact us.

^