Skip Navigation
Small Business Innovation Research/Small Business Tech Transfer

Implementation & Flight Testing of IMPACT System for Autonomous ISR using Collaborating UAVs with Application to Wild Fire Monitoring

Completed Technology Project
103 views

Project Description

Implementation & Flight Testing of IMPACT system for Autonomous ISR using Collaborating UAVs with Application to Wild Fire Monitoring, Phase II
SSCI and MIT propose to further develop, implement and test the Integrated Mission Planning & Autonomous Control Technology (IMPACT) system software for autonomous ISR missions employing collaborating UAVs. IMPACT system is based on real-time learning about dynamic and stochastic environments, and on a capability to autonomously react to contingencies while satisfying the mission objectives and the overall flight safety. Phase II focus will be on real-time vehicle assignment & trajectory planning technologies for forest fire monitoring, overall system integration, and evaluation of its performance through computer and hardware-in-the-loop simulations and flight tests at Olin College or Great Dismal Swamp. Key technologies to be further developed & tested in Phase II include: (i) Vehicle assignment & real time trajectory generation for collaborative ISR for fire boundary identification using the MOTOR system (Multi-objective Trajectory Optimization & Re-planning); (ii) Robust on-line learning for prediction of the fire spread using the intelligent Cooperative Control Architecture (iCCA); (iii) Collaborative assignment for fire perimeter tracking with reactive trajectory planning based on predicted fire spread using MOTOR and iCCA; (iv) Contingency management, including the loss of vehicle, vehicle replacement & mitigation of lost communication link; and (v) Predictive camera pointing control based on predicted fire spread. The project will leverage a number of technologies recently developed by SSCI and MIT, and integrate various system modules within a flexible and user-friendly software product. Phase II deliverables will include the IMPACT software and accompanying documentation, while Phase III will be focused on commercialization of the IMPACT software. More »

Anticipated Benefits

Project Library

Primary U.S. Work Locations and Key Partners

Technology Transitions

Light bulb

Suggest an Edit

Recommend changes and additions to this project record.
^