Evaluate Current State of the Art; Define Critical Performance Requirements; Select Components; Smart Initiator or Smart Connector; Perform Detailed Cost/Benefit Analysis; Develop System Architecture; Build Prototype System; Qualify Prototype System to TRL 6; Develop Full Qualification Plan for implementation on JPL Flight Project.
More »We propose to replace the existing massive cable system with a simpler and much lighter “bussed” system significantly reducing cable mass and complexity. This can be used for a large range of NASA missions improving reliability and reducing mass.