Project Description

Concept for ‘open air’ water extraction soil processor.

Several technologies are being evaluated to extract water from a variety of water-bearing extraterrestrial soils, including near-surface granular and hard hydrated soils, and subsurface ice at Mars, as well as frozen icy soils in the near permanently shadowed regions at the lunar poles. The water can be extracted from the raw resources either by transferring the raw resource into a processor, or by processing the raw resources in situ (where they are found).

One technical approach under investigation is to transfer water-containing soil to a closed processor in either a batch mode or semi-continuously, then apply energy to liberate the water. Currently, terrestrial screw conveyor soil dryers are being investigated at Johnson Space Center (JSC) for their adaptability to use in lunar or Mars conditions. At the same time, NASA Jet Propulsion Laboratory (JPL) is investigating the use of microwave energy to liberate water from soil as it flows through a processor.

A second technical approach under investigation is to deposit water-containing soil onto a heated surface and use the Mars atmosphere as a sweep gas to collect any water vapor released in an ‘open-air’ continuous process.  NASA Glenn Research Center (GRC) is investigating this approach to continually harvest water as the rover/excavator roams the surface. While this process may lose some of the evolved water, it eliminates the need for reusable, high-temperature, dusty seals, and provides heat at the granular level to reduce long heating times.

A third technical approach under investigation is to extract the water directly from the raw resource without any excavation of the soil. NASA Johnson Space Center (JSC) is evaluating the terrestrial Rodriguez Well approach used in Antarctica for potential use on Mars to access nearly-pure ice deposits at some depth below the surface.  This approach first requires a hole to be drilled through any overburden and into the ice sheet. Heat is then applied directly to the ice sheet to melt the ice into a liquid which could then be pumped out when needed.  An evaluation is underway as to the viability of the approach at Mars environmental conditions.

Water Extraction from Regolith is part of the AES In-Situ Resource Utilization (ISRU) Technology Project which is developing the component, subsystem, and system technology to enable production of mission consumables from regolith and atmospheric resources at a variety of destinations for future human exploration missions. 

The overall goals of the ISRU Technology project are to achieve system-level TRL 6 to support future flight demonstration missions and provide exploration architecture teams with validated, high-fidelity answers for mass, power, and volume of ISRU systems.

The project's initial focus is on critical technology gap closure and component development in a relevant environment (TRL 5) for Resource Acquisition (excavation, drilling, atmosphere collection, and preparation/beneficiation before processing) and Resource Processing & Consumable Production (extraction and processing of resources into products with immediate use as propellants, life support gases, fuel cell reactants, and feedstock for construction and manufacturing).  The interim project goal is to complete ISRU subsystem tests in a relevant environment to advance the subsystem to TRL 6.  The project end goals are to perform end-to-end ISRU system tests in a relevant environment (system TRL 6) and integrated ISRU-exploration elements demonstrations in a relevant environment.

ISRU is a disruptive capability that enables more affordable exploration than today's paradigm where all supplies are brought from Earth, and allows more sustainable architectures to be developed.  The availability of ISRU technologies can radically change the mission architecture and be the sizing design driver for other complex systems already in development. For example, the current Mars architecture assumes ISRU production of up to 30 metric tons of propellant on the Mars surface in order to reduce the ascent vehicle landed mass by 75 percent and reduce Earth launch needs by at least 300 metric tons. If a decision was made to use storable propellants for the Mars ascent vehicle instead of ISRU-producible oxygen and methane, many other drastic changes to the architecture could be required, such as lander and ascent vehicle size, number of landers needed, surface operations for ascent vehicle fueling, and Mars rendezvous orbit. Other surface systems might become more complex or heavier if they are not designed to take full advantage of ISRU technologies. Examples include a more complex closed-loop life support system if resupply with ISRU water cannot be assumed, or a heavy, built-in habitat radiation shield if a water- or regolith-based shield cannot be added after habitat delivery to the surface.

Other system designers may also make decisions that reduce the benefit of incorporating ISRU into the mission, resulting in a larger or more inefficient ISRU system. For example, a non-continuous power source such as solar power would increase the required production rate and peak power of an ISRU plant, thus increasing its size and complexity due to hundreds of start-stop cycles.  However, a continuous power source, such as nuclear or solar power with storage, would allow an ISRU plant to operate continuously, thus minimizing its size, complexity, and power draw. These are only a few examples of how the inclusion of ISRU has ripple effects across many other exploration elements.

ISRU is also a new capability that has never before been demonstrated in space or on another extraterrestrial body.  Every other exploration system or element, such as power, propulsion, habitats, landers, life support, rovers, etc., have some form of flight heritage, although almost all still need technology development to achieve the objectives of future missions. This is another critical reason why ISRU technology development, leading to a flight demonstration mission, needs to be started now, so that flight demonstration results can be obtained early enough to ensure that lessons learned can be incorporated into the final design.

This technology development activity was transferred to the STMD Game Changing Development Program in October 2018.

More »

Anticipated Benefits

Project Library

Primary U.S. Work Locations and Key Partners

Technology Transitions

Light bulb

Suggest an Edit

Recommend changes and additions to this project record.
^