Project Description

Astronaut Reid Wiseman demonstrates autonomous operations software onboard ISS, September 2015.

The AES Autonomous Systems and Operations (ASO) project will develop an understanding of the impacts of increasing communication time delays on mission operations, develop autonomy technologies to mitigate the impacts, and infuse them into Human Exploration and Operations systems. The technologies are expected to reduce operations costs as well. This technology has been tested on ISS in FY14-16 as part of the AES Autonomous Mission Operations project; testing continues in FY20-21 under ASO. This technology has also been tested in the Integrated Power, Avionics and Software (IPAS) facility at JSC, and in a testing facility during Exploration Flight Test 1 (EFT-1); software has been infused into the Gateway program as part of the Gateway Vehicle Systems Manager (VSM) software. Further development and tests continue under ASO with ISS  systems.

This project incorporates and builds on the results from the AES Autonomous Mission Operations project.

Future human spaceflight missions will occur with crews and spacecraft at large distances, with long communication delays to the Earth. The one-way light-time delay to the Moon is 1.3 seconds, which is sufficient to make some scenarios (e.g., landing) difficult or impossible to conduct from Earth. One-way communication delays to human exploration destinations such as Near Earth Asteroids (NEAs) range from seconds to minutes. The one-way light-time delay to Mars ranges from 3 minutes (at conjunction) to 22 minutes (at opposition). As the communication delays increase, the crews in the spacecraft must execute, and manage, much of the mission themselves. Throughout the course of a mission, as distances increase, NASA must continue to migrate operations functionality from the remote Mission Control Center flight control room to the vehicle for use by the crew. The role of the ground control teams and systems will evolve away from real-time support to a more long-range planning, diagnosis, analysis, and prognostics support role, while the vehicle systems and crew must take on the role of onboard daily schedule execution, planning, and systems management. Both ground and vehicle systems will require automation to maximize crew functionality, minimize unnecessary overhead, and reduce operating costs. This project is to understand the impacts of increasing communications time delays on operations and to develop technologies to mitigate the impacts.

More »

Anticipated Benefits

Project Library

Primary U.S. Work Locations and Key Partners

Light bulb

Suggest an Edit

Recommend changes and additions to this project record.
^